Friday, September 18, 2015

9-18-2015 All Through at Spartan Chassis (Elkhart [IN] RV Park)

Bright and early--7:00 a.m.--Andy, the tech, was knocking at the front door.

About 11 Andy finished with the new brake drums/drums/chambers.
At 1:30 the office went over the itemized bill with Glen, accepted payment, and we headed south.

Yes, we were there a week.  But, Glen says there isn't another place in the country that could do the work.  We are very impressed with the quality of the work.

Andy the tech invited Glen down into the pit to see all that was worked on.  This was the first time Glen had seen the underneath of the motor home.  Glen says he learned several things just by Andy pointing out things and saying "this needs to be done every 500 miles" or "this is what we lubed the jacks with", etc.

It has rained since last night.

The weather and time left before the makeover begins encouraged us to make different plans.  We are not going to the dunes along Lake Michigan and we are not going to Maumee Bay State Park in Ohio.

We are back in Elkhart, IN.  We need to finish packing a suitcase or two in preparation for our time out of the motor home.  Glen is changing out the puck lights located through out the motor home.  No more brassy gold lights.  The new ones are also LED, a much better light.

Everyone have a good week end.  Autumn is coming.  The maple trees are changing colors.  The goldenrod is blooming Ach-choo!


No comments:

Post a Comment